Energy Optimization Projects Implemented
Combustion Blower System Optimization
A groundbreaking energy optimization project at Banacombai Tea Plantations that revolutionized our manufacturing efficiency through innovative blower system.
Key Achievements
Annual energy savings of 104,247 kWh
24% reduction in firewood consumption (258.5 tons saved annually)
16% decrease in electrical energy usage
Strategic Solar Implementation
An innovative 8-kW solar pilot project designed as a strategic stepping stone towards comprehensive renewable energy adoption.
Project Highlights
Pilot installation serving as proof-of-concept for 200+ kW system
Real-time performance monitoring in challenging hilly terrain
Comprehensive data collection on seasonal variations
Assessment of maintenance requirements and operational costs