Skip to content

Energy Optimization Projects Implemented

Combustion Blower System Optimization

A groundbreaking energy optimization project at Banacombai Tea Plantations that revolutionized our manufacturing efficiency through innovative blower system.

Key Achievements

  • Annual energy savings of 104,247 kWh
  • 24% reduction in firewood consumption (258.5 tons saved annually)
  • 16% decrease in electrical energy usage

Strategic Solar Implementation

An innovative 8-kW solar pilot project designed as a strategic stepping stone towards comprehensive renewable energy adoption.

Project Highlights

  • Pilot installation serving as proof-of-concept for 200+ kW system
  • Real-time performance monitoring in challenging hilly terrain
  • Comprehensive data collection on seasonal variations
  • Assessment of maintenance requirements and operational costs